Solar contractor licenses in California
By Contractor Lookout · Updated November 3, 2026
To install solar panels on a California home, look for a contractor with a C-46 Solar or C-10 Electrical license. For a home battery, a C-10 can install it on its own, while a C-46 can install one only as part of a solar job and only if the battery is 80 kWh or smaller.
The rules come from CSLB’s regulations for the C-46 and C-10 classes, 16 CCR 832.46 and 832.10, as amended in an order of adoption dated April 23, 2024.
Which license covers what
| Work | C-46 Solar | C-10 Electrical |
|---|---|---|
| Photovoltaic (PV) solar panels | Yes | Yes |
| Solar thermal systems | Yes | Not addressed here |
| Battery storage installed with a new PV system, 80 kWh or less | Yes, as incidental and supplemental to the PV work | Yes |
| Battery storage over 80 kWh | No | Yes |
| Battery storage on its own, with no PV install | No | Yes |
In CSLB’s current file, 1,184 licenses hold the C-46 class and 29,124 hold the C-10.
C-46 Solar
Under 16 CCR 832.46, a C-46 Solar contractor installs solar thermal and photovoltaic systems. The 2024 amendment made a point of saying that a battery energy storage system “shall not be considered part of a photovoltaic solar energy system.” A C-46 can still install a battery, but only when two conditions hold:
- The battery is “incidental and supplemental” to a PV installation the C-46 is doing.
- The battery system is 80 kWh or smaller.
If you want a battery added to panels you already have, or a large battery system, a C-46 alone isn’t the right license.
C-10 Electrical
The amended 16 CCR 832.10 lists both battery energy storage systems and photovoltaic solar energy systems within the C-10 Electrical class. A C-10 can install panels, batteries or both.
If timing matters for your contract, check the current rule with CSLB.
What about a B General Building contractor?
A B General Building contractor’s role on solar and battery work isn’t settled in the sources we checked. A CSLB board packet suggests a B may install a battery as part of a PV installation connected to a structure, but we saw that only in summary and couldn’t verify it. Check with CSLB before hiring a B for solar or battery work.
The B two-trade rule in BPC 7057 also applies. A B can’t take a prime contract for work outside framing or carpentry unless the job involves at least two unrelated trades besides framing or carpentry, or the B holds the specialty license or subcontracts to a licensed specialty contractor. A solar-only job may not meet that test. Our A vs B vs C guide explains the rule.
How to check a solar installer
- Get the license number from the bid, not just the company name.
- Look it up. Use our search or browse solar contractors in San Diego and other cities. Then confirm on CSLB’s Instant License Check, since our data is a weekly file.
- Read the classes. Look for C-46 or C-10. If the job includes a battery, check the table above.
- Check status, bond and workers’ comp. The license should be Clear, with a $25,000 contractor’s bond and either a workers’ comp policy or a valid exemption. Our license check guide covers each.
- Check the salesperson. If someone other than the contractor sells you the job, that person must be registered as a Home Improvement Salesperson. See HIS registration explained.
The contract and payments
A home solar installation done under a home improvement contract follows the same rules as any other home improvement job:
- A written contract is required for home improvement work over $500 (BPC 7159).
- The down payment can’t be more than $1,000 or 10% of the price, whichever is less, unless the contractor has a qualifying blanket performance and payment bond (BPC 7159.5).
- Payments can’t run ahead of the work performed.
- You generally have 3 business days to cancel, 5 if you’re 65 or older, and 7 for disaster repairs.
See our down payment guide for how to work out the cap.
This is general information, not legal advice.
Sources
- CSLB order of adoption for 16 CCR 832.46 and 832.10: https://www.cslb.ca.gov/Resources/LawsAndRegulations/2024/BESS%20FINAL%20PACKAGE_(3)_Order%20of%20Adoption%20Final.pdf
- CSLB board packet on energy storage (seen in summary only, not verified): https://www.cslb.ca.gov/Resources/BoardPackets/ESS_Follow_Up_Study_7_26.v7.pdf
- BPC 7057: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7057
- BPC 7159: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7159
- BPC 7159.5: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7159.5
- Civil Code 1689.6: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV§ionNum=1689.6
- CSLB Instant License Check: https://www.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx